Commit graph

4 commits

Author SHA1 Message Date
Teknium
39975613b1
test: prune wave 2 + speed fixes — 28,106 → 19,757 test functions, suite wall 315s → 294s
Second, deeper pass over tools/gateway/hermes_cli plus first pass over
the trees wave 1 missed (acp, acp_adapter, skills, computer_use, docker,
dashboard, conformance, monitoring, secret_sources, hermes_state,
providers). Same rubric as wave 1 (AGENTS.md test policy); security,
alternation/caching invariants, issue-number regressions, and E2E kept.

Real test-quality fixes found and rooted out along the way:
- tests/tools/test_command_guards.py made real auxiliary-LLM HTTPS calls
  (DEFAULT_CONFIG smart-approval leaked in) — pinned approval
  mode=manual via autouse fixture: 17.4s → 0.4s.
- test_model_switch_custom_providers.py / test_user_providers_model_switch.py
  silently probed live provider catalogs (~2s/test) — stubbed
  cached_provider_model_ids/provider_model_ids/fetch_api_models.
- test_telegram_noise_filter.py: 15-platform copy-paste matrix over
  shared gateway.run logic → 3 representative platforms (55s → 3.9s).
- test_gateway_shutdown.py: stop()'s 5s interrupt-deadline loop spun on
  MagicMock agents — interrupt.side_effect now clears _running_agents
  (22s → 1.0s).
- test_gateway_inactivity_timeout.py poll-harness timings shrunk 3-5x
  (24s → 1.1s); test_mcp_stability.py backoff/SIGTERM-grace sleeps
  patched (15.4s → 2.5s); test_async_delegation.py negative-drain wait
  5s → 0.5s.
- test_telegram_init_deadline.py: loop-block margin restored to 1.0s
  with rationale comment — the watchdog-dump assertion needs the loop
  blocked well past deadline+grace under parallel load (flaked once in
  the 40-worker verification run at a 0.2s margin).

Verification: full hermetic suite via scripts/run_tests.sh —
2,438 files, 21,718 tests passed, 0 failed, 293.9s wall.
Suite totals vs original baseline: 46,820 → 19,757 test functions
(−57.8%), wall 583.5s → 293.9s (−50%), subprocess CPU 13,564s → 11,623s.
2026-07-29 13:39:40 -07:00
Teknium
b1201213b7 fix(gateway): honest durable ack semantics for undeliverable async completions
Adapter acceptance is not proof of delivery: the inner #55578 resolver can
still fail closed inside the message pipeline after the adapter accepted the
synthetic event, which falsely acknowledged the durable row as delivered and
silently discarded the delegation result.

Pre-flight the delivery target in _deliver_completion_notification before
adapter acceptance (adapted from #65838 by @henrynguyeninfo1):
- live parent or verified live compression tip -> deliver (inner resolver
  still owns the actual route retarget)
- explicit-reset / unknown parent -> terminal 'dropped' disposition via new
  drop_completion_delivery() (not falsely 'delivered', not eternally
  'pending')
- transient uncertainty (DB error, mid-flight rotation without a visible
  continuation) -> release the claim for retry

release_completion_delivery() now converges to a terminal 'dropped' state
once _MAX_DELIVERY_ATTEMPTS is exhausted, so an undeliverable completion
cannot replay on every gateway restart forever.
2026-07-22 06:56:08 -07:00
teknium1
d0e9a42cec fix(delegation): harden durable completion delivery 2026-07-13 07:28:21 -07:00
John Lussier
94a7705bdd fix(gateway): deduplicate completion delivery 2026-07-13 07:28:21 -07:00