📝 docs(kanban): clarify dependent task gating
This commit is contained in:
parent
954e854ccc
commit
71198b9e19
2 changed files with 8 additions and 2 deletions
|
|
@ -68,6 +68,7 @@ Your job description says "route, don't execute." The rules that enforce that:
|
|||
- **For any concrete task, create a Kanban task and assign it.** Every single time.
|
||||
- **Split multi-lane requests before creating cards.** A user prompt can contain several independent workstreams. Extract those lanes first, then create one card per lane instead of bundling unrelated work into a single implementer card.
|
||||
- **Run independent lanes in parallel.** If two cards do not need each other's output, leave them unlinked so the dispatcher can fan them out. Link only true data dependencies.
|
||||
- **Never create dependent work as independent ready cards.** If a card must wait for another card, pass `parents=[...]` in the original `kanban_create` call. Do not create it first and link it later, and do not rely on prose like "wait for T1" inside the body.
|
||||
- **If no specialist fits the available profiles, ask the user which profile to create or which existing profile to use.** Do not invent profile names; the dispatcher will silently drop unknown assignees.
|
||||
- **Decompose, route, and summarize — that's the whole job.**
|
||||
|
||||
|
|
@ -85,7 +86,7 @@ Before creating anything, draft the graph out loud (in your response to the user
|
|||
2. Map each lane to one of the profiles you discovered in Step 0. If a lane doesn't fit any existing profile, ask the user which to use or create.
|
||||
3. Decide whether each lane is independent or gated by another lane.
|
||||
4. Create independent lanes as parallel cards with no parent links.
|
||||
5. Create synthesis/review/integration cards with parent links to the lanes they depend on.
|
||||
5. Create synthesis/review/integration cards with parent links to the lanes they depend on. A child created with unfinished parents starts in `todo`; the dispatcher promotes it to `ready` only after every parent is done.
|
||||
|
||||
Examples of prompts that should fan out (using placeholder profile names — substitute whatever exists on the user's setup):
|
||||
|
||||
|
|
@ -133,6 +134,8 @@ t4 = kanban_create(
|
|||
|
||||
`parents=[...]` gates promotion — children stay in `todo` until every parent reaches `done`, then auto-promote to `ready`. No manual coordination needed; the dispatcher and dependency engine handle it.
|
||||
|
||||
If the task graph has dependencies, create the parent cards first, capture their returned ids, and include those ids in the child card's `parents` list during the child `kanban_create` call. Avoid creating all cards in parallel and linking them afterward; that creates a window where the dispatcher can claim a child before its inputs exist.
|
||||
|
||||
### Step 4 — Complete your own task
|
||||
|
||||
If you were spawned as a task yourself (e.g. a planner profile was assigned `T0: "investigate Postgres migration"`), mark it done with a summary of what you created:
|
||||
|
|
|
|||